Microservice Calls’ Critical Path Analysis With Jaeger and Uber’s CRISP

Discovering which services need to be optimised to reduce end-to-end latency in a microservices-based system can be challenging because call graphs may be too complicated to read. Uber described an open-source tool called CRISP built to solve this problem by finding the critical paths in these graphs. These paths identify those operations whose optimisation benefits the overall system. By Vasco Veloso

Discovering which services need to be optimised to reduce end-to-end latency in a microservices-based system can be challenging because call graphs may be too complicated to read. Uber described an open-source tool called CRISP built to solve this problem by finding the critical paths in these graphs. These paths identify those operations whose optimisation benefits the overall system.

By Vasco VelosoRead More

Comente

O seu endereço de e-mail não será publicado. Campos obrigatórios são marcados com *

Posts Populares

  • All Post
  • Autorais
  • Destaque
  • Destaques
  • Educação
  • Feeds de Arquitetura de Software
  • Feeds DevOps
  • Gestão
  • Sem categoria
  • Tecnologia
    •   Back
    • Agilidade
    • Scrum
    •   Back
    • Excel
    • BI
    • IA
    • Big Data
    •   Back
    • Inglês
    •   Back
    • Scrum

Atualidades e Experiências

Acompanhe os conteúdos e siga a trilha que mais te interessa: Tecnologia, Educação e Gestão

Categorias

Edit Template

EDSPACE

Apenas uma missão, compartilhar conhecimento.

Posts Recentes

  • All Post
  • Autorais
  • Destaque
  • Destaques
  • Educação
  • Feeds de Arquitetura de Software
  • Feeds DevOps
  • Gestão
  • Sem categoria
  • Tecnologia
    •   Back
    • Agilidade
    • Scrum
    •   Back
    • Excel
    • BI
    • IA
    • Big Data
    •   Back
    • Inglês
    •   Back
    • Scrum

© 2022. Edspace. Todos Direitos Reservados